Slide
Applied Ingenuity Since 1994.

Providing cutting edge solutions in temporary structure and engineering technology.

GJP_3727
In House Scaffolding Design Team

Providing cutting edge solutions in temporary structure and engineering technology.

Barkers - Kensington High Street & Derry Street - Initial Strike
Heritage & listed building temporary works

Providing cutting edge solutions in temporary structure and engineering technology.

clock-1
Banner Frames and Building Façade Wraps

Providing cutting edge solutions in temporary structure and engineering technology.

previous arrow
next arrow

Who We Are

Established in 1994, we are a professional commercial access scaffolding contractor providing an experienced approach from project inception to final account agreement. Partnering with contractors to produce bespoke scaffold schedules and early design advice with a view to value engineering a scheme to a realistic budget.

What We Do

We are specialists in tube & fitting scaffolding and are approved installers of the Hakitec 750 rolling roof system. We are full members of the NASC and our CISRS trained operatives and staff work strictly within their safety parameters. We have our own in house design department supporting our contracts team with the ability to produce drawings in a more timely fashion than an outsourced arrangement

JDC Scaffolding And UKSSH Look Smart In Kensington

Working closely with UK System Scaffold Hire, JDC Scaffolding developed an innovative gantry design which used HAKI Tripods to minimise disruption in Kensington High Street.

Even with the reduced footfall and lower traffic levels created by Covid-19, scaffolding an iconic building in Kensington High Street poses major challenges, including the need to minimise impact on pedestrian traffic and the requirement

Complex architectural restorations at the Annexe Building, West Smithfield

We were appointed by Mclaughlin and Harvey to provide the scaffolding package for their building works to architecturally restore and structurally repair the Annexe building, Red House and Iron Mountain.

JDC have erected temporary roofs to provide weather protection to the building whilst works are completed. The Fish Market and Iron Mountain required roof repairs so JDC have provided propping and access scaffold to the areas allowing them to be inspected before remedial works have been actioned
.

Keep Up-To Date With Our Latest News And Projects

Hallmark Building

Works are continuing for Paye Stonework & Restoration Ltd at the Hallmark Building with elevations on both Fenchurch Street and Leadenhall Street in the City of London. The elevation at…

New Bridge Street

Works are continuing at our New Bridge Street project for McLaughlin & Harvey Ltd, opposite Blackfriars Station. A Design & Build project which comprises the demolition of existing cores, demolition…

JDC

All levels of scaffolders required Immediate Start

CENTRAL LONDON £100 - £210 per day

depending on Qualification.

NOW HIRING

All levels of CISRS Scaffolders required – Advanced/Scaffolder/Trainee/Labourer

Urgently required for Scaffolding work in and around Central London

Start ASAP

Must have a valid CISRS Card

Please call

07970 683577 or 07834 541015