McLaughlin & Harvey
JDC interfaced well with MCLH from Pre-Construction stage right through to the present on an extremely difficult and logistically challenging project.
They were always on hand to attend site meetings to discuss issues and overcome obstacles which presented themselves in a historic dilapidated building. Their onsite Team has been a great asset to the job from the start, a hardworking, problem-solving team, which was well needed on a project of this scale.
JDC has demonstrated excellent standards of safety performance throughout their time on the COL Annexe project to date. On what is an extremely intricate site, they have designed, constructed and maintained complex scaffolding systems with H&S at the forefront.
I have found JDC to be very proactive in their approach to the safety of its workforce and others utilising their scaffolds on site. They have been cooperative throughout and able to provide innovative solutions for safe access to what are often restricted works areas.
Their designs allowed work to be carried out under a scaffold canopy that protected both the listed building and the operatives carrying out the restoration.